One-Stop China-US Cross-Border Logistics · National Hotline 4000055859 · 7×24 Online

9 Clauses an Export Contract Must Spell Out

International Trade Basics About 10 min read Updated 2026-10-12
On This Page (11 sections)

An export contract is not to be feared for being long, but for missing items. These 9 clauses are the baseline; miss one and problems can arise in later stages.

1. Product name and specifications

State the product name, model, material, grade and use clearly.

The product name must be consistent with the customs declaration and the letter of credit; the same batch of goods cannot appear under three different names.

2. Quantity and more-or-less clause

State the quantity, unit of measurement and total number of packages clearly.

For bulk cargo, a more-or-less clause may be agreed, allowing a certain range of quantity variation, with the specific range agreed by both parties.

3. Price and trade term

State the unit price, total price and currency.

The trade term must carry the version number and the named place, for example "FOB Shanghai, Incoterms 2020".

4. Payment method

Choose one or a combination of T/T, L/C, D/P, D/A and O/A.

If L/C is used, state the issuing bank, time of issuance, type of letter of credit and validity period.

Writing only "T/T or L/C" is as good as no agreement; at the performance stage either side can push back.

5. Packaging and marks

State the packaging method, material, number of packages, weight and volume per package.

The marks (shipping marks) include the consignee code, destination and package number, and must be consistent with the packing list.

6. Shipment clause

The shipment period, port of shipment and port of destination must all be stated.

At the same time, make clear whether partial shipment is allowed and whether transhipment is allowed.

7. Documentation clause

List which documents the buyer needs, how many copies of each, and whether originals are required.

Common ones include: commercial invoice, packing list, bill of lading, certificate of origin, insurance policy and inspection certificate.

8. Quality and inspection

By what standard the inspection is done, by whom, and at which stage.

Make clear whether the inspection report serves as the basis for payment or claims.

9. Dispute resolution

Which country's law applies, whether arbitration or litigation, and where the arbitration seat is.

Without this clause, when a problem arises there is not even a place to assert your rights.

Nine-clause quick reference table

Clause What must be stated clearly
Product name and specifications Product name, model, material, grade
Quantity Quantity, unit, number of packages, more-or-less range
Price Unit price, total price, currency, term with version and place
Payment method Method, timing, L/C requirements
Packaging and marks Packaging method, material, mark content
Shipment clause Shipment period, port of shipment, port of destination, partial shipment and transhipment
Documentation clause Types of documents, number of copies, original or copy
Quality inspection Standard, inspecting party, effect of the report
Dispute resolution Applicable law, arbitration or litigation, place

Four pitfalls that are easy to fall into

The product name is written inconsistently on the contract, invoice and customs declaration, and customs clearance gets stuck right away.

Only the term abbreviation is written, without the version number and named place.

The payment method is written as "or", which is as good as leaving a loophole.

Without a dispute resolution clause, there is no way to assert rights when a real problem arises.

Huaqiutong tip: Before signing a contract, do a "three-document cross-check": the product name, quantity and amount on the contract, invoice and packing list must be exactly the same. Customs declaration and the letter of credit are both checked against these three documents; any inconsistency means amendments and rework later.
Want to work out exactly what this shipment will cost? Enter the destination and cargo volume on the official website for a live quote in 30 seconds, with manual review by our service team within 30 minutes — www.hqtexp.com

Related Articles

US NETWORK US Warehouse Network · Port-to-Warehouse Distance Reference Click a Marker for Details · Port-to-Warehouse / Warehouse-to-Warehouse Routes Available Map Data © OpenStreetMap · Routing © OSRM
Select Origin and Destination, Then Click to Search
The Map Will Draw the Route and Calculate Mileage
Enter Any US Address, City Name, or ZIP Code to Search
Mileage is a Highway Reference Value, Excluding Loading, Unloading, and Customs Clearance Time
Owned / Partner Warehouses Major Ports of Entry Inland Hubs Get Route Custom Address FBA Warehouse
Live Chat
Call UsGet a Quote